Table 4.
Power calculation.
Risk Control | Risk Intervention | Risk ratio detected | Power |
---|---|---|---|
15% | 5% | 0.53 | 80% |
6.5% | 0.43 | 90% | |
20% | 11% | 0.55 | 80% |
12% | 0.60 | 90% | |
25% | 14% | 0.56 | 80% |
15% | 0.60 | 90% |
Power calculation.
Risk Control | Risk Intervention | Risk ratio detected | Power |
---|---|---|---|
15% | 5% | 0.53 | 80% |
6.5% | 0.43 | 90% | |
20% | 11% | 0.55 | 80% |
12% | 0.60 | 90% | |
25% | 14% | 0.56 | 80% |
15% | 0.60 | 90% |