Skip to main content
. 2021 Sep 29;14:80. doi: 10.1186/s40545-021-00368-x

Table 2.

Country-identified bottlenecks in the current iSC and priorities for the system design approach

Bottlenecks Priority
Sierra Leone

●Inadequate workload balance

●Additional skills building needed

●Forecasts do not match consumption

●Insufficient funds for distribution

●Ensure availability of vaccines to all children

●Reduce operating costs/improve cost effectiveness

●Ensure CCE at all (or at least 80% of) HFs

●Optimize storage space

●Integrate with other cold chain products

●Consider different vaccine vial presentations

●Reach underserved/hard-to-reach areas (equity)

●Reduce time spent in logistics

●Guarantee distribution from district to HF

●Optimize district/regional stores and their linked network/transport routes

●Optimize transport system for district distribution and supervision

Niger

●Insufficient transport, particularly at sub-national levels

●Security challenges in conflict-prone areas

●Human resource (HR) constraints in availability and skills

●Achieve a more reliable system

●Guarantee regular delivery of vaccines to the last mile

●Ensure quality of vaccines in sufficient quantity

●Optimize use of CCE

●Base supply chain decisions on actual data

●Integrate management system with qualified staff

Madagascar

●Failure to use the regional administrative level for the iSC

●Unused regional cold rooms

●Antiquated facility-level CCE depend on propane tanks

●Inadequate funds and insufficient vehicles to support distribution

●Insufficient HR for iSC management

●Ad hoc district distribution to HFs

●Ensure an effective, equitable, and adaptable system

●Provide reliable data

●Reduce operating costs

●Increase immunization coverage

●Reduce expired vaccines

●Promote sustainability

●Upgrade CCE

Guinea

●Lack of cold chain at regional level

●Insufficient cold chain capacity at districts and HFs

●Insufficient means of transport

●Insufficient HR capacity for CCE maintenance

●Inadequate budgeting and planning based on inaccurate population estimates

●Ensure an effective, equitable, and adaptable system

●Provide reliable data through computerized system

●Introduce cost savings

●Promote sustainability

●Decentralize to ensure all products are available at HF

●Integrate and provide high-quality services

●Ensure availability of CCE at all levels

●Allocate qualified and sufficient HR

●Establish regional cold chain depots