Skip to main content
. 2021 Sep 27;9:753951. doi: 10.3389/fpubh.2021.753951

Table 3.

Authors, maintenance activity, output indicator, and outcomes.

Authors (Region) Maintenance activity Output indicator Outcomes
PM CM RP
Kovacevic et al. (19) (Bosnia and Herzegovina) Prediction accuracy. Performance prediction, potential breakdowns, and maintenance cost optimization of infant incubators.
Badnjevic et al. (20) (Bosnia and Herzegovina) Prediction accuracy. Performance prediction, potential breakdowns, and maintenance cost optimization of defibrillators.
Saleh et al. (21) (Italy) Priority score. Prioritisation of highly critical medical equipment.
Hernandez-Lopez et al. (22) (Mexico) Preventive maintenance index value. Lifespan maximisation, operations cost optimization, and prioritisation of medical equipment.
Jamshidi et al. (23) (Canada) Priority score. Availability enhancement, cost optimisation, and prioritisation of medical equipment.
Faisal et al. (24) (Egypt) Replacement score. Availability enhancement, cost optimisation, and prioritisation of medical equipment.
Tawfik et al. (25) (Egypt) Risk classification score. Cost optimisation and prioritisation of medical equipment.
Jarikji et al. (26) (Lebanon) Replacement score. Prioritisation of highly critical medical equipment.
Aridi et al. (27) (Lebanon) Replacement score. Cost optimisation and prioritisation of medical equipment.
Hamdi et al. (28) (Jordan) Priority score. Reliability and availability improvement, and prioritisation of medical equipment.
Hutagalung et al. (29) (Indonesia) Criticality score. Availability enhancement and cost minimisation through effective maintenance plan.
Taghipour et al. (30) (Canada) Criticality score. Condition identification and prioritisation of medical equipment.
Ben Houria et al. (31) (Tunisia) Criticality score. Reliability and availability enhancement, cost optimisation, and prioritisation of high-risk medical equipment.
Oshiyama et al. (32) (Brazil) Classification division. Prioritisation of medical equipment.
Saleh and Balestra (33) (Italy) Criticality index score. Prioritisation of critical medical equipment.
Ismail et al. (34) (Lebanon) Risk severity number. Failures mitigation and prediction of medical equipment.

PM, Preventive Maintenance; CM, Corrective Maintenance; RP, Replacement Plan.