Table 3.
Authors, maintenance activity, output indicator, and outcomes.
Authors (Region) | Maintenance activity | Output indicator | Outcomes | ||
---|---|---|---|---|---|
PM | CM | RP | |||
Kovacevic et al. (19) (Bosnia and Herzegovina) | ✓ | ✓ | Prediction accuracy. | Performance prediction, potential breakdowns, and maintenance cost optimization of infant incubators. | |
Badnjevic et al. (20) (Bosnia and Herzegovina) | ✓ | ✓ | Prediction accuracy. | Performance prediction, potential breakdowns, and maintenance cost optimization of defibrillators. | |
Saleh et al. (21) (Italy) | ✓ | Priority score. | Prioritisation of highly critical medical equipment. | ||
Hernandez-Lopez et al. (22) (Mexico) | ✓ | Preventive maintenance index value. | Lifespan maximisation, operations cost optimization, and prioritisation of medical equipment. | ||
Jamshidi et al. (23) (Canada) | ✓ | ✓ | Priority score. | Availability enhancement, cost optimisation, and prioritisation of medical equipment. | |
Faisal et al. (24) (Egypt) | ✓ | Replacement score. | Availability enhancement, cost optimisation, and prioritisation of medical equipment. | ||
Tawfik et al. (25) (Egypt) | ✓ | ✓ | Risk classification score. | Cost optimisation and prioritisation of medical equipment. | |
Jarikji et al. (26) (Lebanon) | ✓ | Replacement score. | Prioritisation of highly critical medical equipment. | ||
Aridi et al. (27) (Lebanon) | ✓ | Replacement score. | Cost optimisation and prioritisation of medical equipment. | ||
Hamdi et al. (28) (Jordan) | ✓ | ✓ | Priority score. | Reliability and availability improvement, and prioritisation of medical equipment. | |
Hutagalung et al. (29) (Indonesia) | ✓ | ✓ | Criticality score. | Availability enhancement and cost minimisation through effective maintenance plan. | |
Taghipour et al. (30) (Canada) | ✓ | ✓ | Criticality score. | Condition identification and prioritisation of medical equipment. | |
Ben Houria et al. (31) (Tunisia) | ✓ | ✓ | Criticality score. | Reliability and availability enhancement, cost optimisation, and prioritisation of high-risk medical equipment. | |
Oshiyama et al. (32) (Brazil) | ✓ | Classification division. | Prioritisation of medical equipment. | ||
Saleh and Balestra (33) (Italy) | ✓ | Criticality index score. | Prioritisation of critical medical equipment. | ||
Ismail et al. (34) (Lebanon) | ✓ | ✓ | Risk severity number. | Failures mitigation and prediction of medical equipment. |
PM, Preventive Maintenance; CM, Corrective Maintenance; RP, Replacement Plan.