Skip to main content
. 2021 Sep 13;17(10):6366–6386. doi: 10.1021/acs.jctc.1c00582

Table 2. Basis Set Convergence Study for DLPNO-CCSD Calculations of the Aiso Parameter of Optimized HMI under Vacuum with Fixed Auxiliary Basis Set, Full Electron Treatment, and Different Contraction Schemes of the Basis Functions Contracted = Contraction of the Whole Basis Set, Decontracted-s = Decontracted s-Functions of the Basis Set, Decontracted-b = Decontraction of the Whole Basis Set.

basis set contraction scheme time Aiso(N) (MHz)
def2-SVP contracted 29 min 65.4
  decontracted-s 56 min 25.5
  decontracted-b 63 min 24.7
def2-TZVPP contracted 4.8 h 27.1
  decontracted-s 7.1 h 29.6
  decontracted-b 12.4 h 29.5
def2-QZVPP contracted 1.9 days 29.6
  decontracted-s 2.7 days 29.1
  decontracted-b 3.6 days 29.7
cc-PCVDZ contracted 48 min 24.1
  decontracted-s 78 min 30.0
  decontracted-b 99 min 28.7
cc-PCVTZ contracted 12.4 h 28.5
  decontracted-s 16.1 h 29.3
  decontracted-b 15.8 h 29.5
cc-PCVQZ contracted 4.1 days 30.1
  decontracted-s 4.7 days 29.8
  decontracted-b 5.1 days 29.5