Skip to main content
. 2021 Aug 27;1(1):71–84. doi: 10.1021/acsenvironau.1c00007

Figure 5.

Figure 5

Maximum measured velocities and estimated uncertainties using hot wire anemometry (black), schlieren (gray), and laser sheet imaging (white).