Table 2.
Inputs/output for the FRB model (Khalili-Damghani, et al., 2014)
| Variable | Criteria |
|---|---|
| Input | Transportation cost |
| Reverse logistic | |
| Manufacturing | |
| Output | Project Selection |
Inputs/output for the FRB model (Khalili-Damghani, et al., 2014)
| Variable | Criteria |
|---|---|
| Input | Transportation cost |
| Reverse logistic | |
| Manufacturing | |
| Output | Project Selection |