Skip to main content
[Preprint]. 2023 Jan 25:2021.10.19.21265226. Originally published 2021 Oct 20. [Version 2] doi: 10.1101/2021.10.19.21265226

Fig 2: Wastewater and surface sampling and 95% confidence interval across full 12-week pilot period, and with consent at 70% or above (weeks 9–12).

Fig 2: