Skip to main content
. 2021 Sep 9;81(9):800. doi: 10.1140/epjc/s10052-021-09538-2

Fig. 18.

Fig. 18

The ratio of the primary (best available) to secondary (next-best available) luminosity as computed in time windows of approximately 20min each. The left plot shows the 2015 results (principally PCC/RAMSES), and the right plot shows the 2016 results (principally PCC/HFOC). Each entry is weighted by the integrated luminosity for the time period