Skip to main content
. 2021 Apr 20;128(6):753–766. doi: 10.1093/aob/mcab051

Table 5.

Time estimation for each human-assisted step to produce reference data. The time estimate is for one person and does not consider the time needed to execute the automated part of the pipeline method

Time per tree Time for the 1-ha plot (391 trees)
1. Tree location A few seconds to 2 min 1–2 d
2. Tree isolation 7–10 min 6–9 d
3. Wood/leaf segmentation 15–25 min 19–22 d
4. Tree reconstruction 15–30 min 21–24 d