Skip to main content
. 2021 Nov 8;22:784. doi: 10.1186/s13063-021-05688-6

Fig. 2.

Fig. 2

Schematic of multicenter cluster randomized, stepped wedge design. An overview of the multicenter cluster randomized, stepped wedge implementation design. Each “step” represents the crossover at 3-month intervals from the pre-implementation period to the post-implementation period, with the first month of the crossover period considered a wash-out period