Table 1.
Scenario | TJRE diversion limit | SAB/PTB wastewater input |
---|---|---|
Baseline | 2 MGD (0.09 m3 s−1) | Untreated 35 MGD (1.53 m3 s−1) |
Scenario A | 35 MGD (1.53 m3 s−1) | Treated 10 MGD (0.44 m3 s−1) |
Scenario B | 100 MGD (4.38 m3 s−1) | Untreated 35 MGD (1.53 m3 s−1) |
Scenario C | 163 MGD (7.14 m3 s−1) | Untreated 35 MGD (1.53 m3 s−1) |