Table 5. Streams and Cost Data for Case 3a.

stream Tin/°C Tout/°C FCp/kW·°C–1 h/kW·m–2·°C–1
H1 385 159 131.51 1.238
H2 516 43 1198.96 0.546
H3 132 82 378.52 0.771
H4 91 60 589.545 0.859
H5 217 43 186.216 1
H6 649 43 116 1
C1 30 385 119.1 1.85
C2 99 471 191.05 1.129
C3 437 521 377.91 0.815
C4 78 418.6 160.43 1
C5 217 234 1297.7 0.443
C6 256 266 2753 2.085
C7 49 149 197.39 1
C8 59 163.4 123.156 1.063
C9 163 649 95.98 1.81
C10 219 221.3 1997.5 1.377
HU1 1800 800   1.2
HU2 509 509   1.0
CU 38 82   1.0