|
Indices
|
|
| i |
EV indice |
| t |
Time-step indice |
| w |
WT indice |
|
Parameters
|
|
|
|
PV availability |
|
|
Consumption per kilometer of the i-th EV |
|
|
Maximum power that can be charged to the i-th EV |
|
|
Maximum power that can be charged to the BESS |
|
|
Daily distance travelled by the i-th EV |
|
|
Daily consumption of the i-th EV |
|
|
Maximum power that can be discharged from the i-th EV |
|
|
Maximum power that can be discharged from the BESS |
|
|
Maximum PV forecast error at time-step t |
|
|
Maximum WF forecast error at time-step t |
|
|
Load at time-step t |
|
|
Commercial load at time-step t |
|
|
Industrial load at time-step t |
|
|
Residential load at time-step t |
|
|
Production of the w-th WT at time-step t |
|
|
Production of the PV system at time-step t |
|
|
Production of the WF at time-step t |
|
|
Maximum state of charge of the i-th EV |
|
|
Maximum state of charge of the BESS |
|
|
Minimum state of charge of the i-th EV |
|
|
Minimum state of charge of the BESS |
|
|
Time of departure of the i-th EV |
|
|
Consumption of the i-th EV due to transportation at time-step t |
|
|
User-defined state of charge of the i-th EV at the time of departure |
|
|
Variation of residential load at time-step t |
|
|
Efficiency of the battery of the i-th EV |
|
|
Efficiency of the BESS |
| Δt |
Duration of time-step t |
|
Decision variables
|
|
|
|
The power charged to the i-th EV at time-step t |
|
|
The power charged to the BESS at time-step t |
|
|
The power discharged from the i-th EV at time-step t |
|
|
The power discharged from the BESS at time-step t |
|
|
The power exported to the main grid at time-step t |
|
|
The power imported to the main grid at time-step t |
|
|
State of charge of the i-th EV at time-step t |
|
|
State of charge of the BESS at time-step t |
|
|
Binary variable indicating whether the i-th EV is being charged at time-step t |
|
|
Binary variable indicating whether the BESS is being charged at time-step t |
|
|
Binary variable indicating whether the BESS is being discharged at time-step t |
|
|
Binary variable indicating whether the i-th EV is being discharged at time-step t |