Table 1.
Green smart building evaluation system.
| Target layer | First-level indicators | Secondary indicators | Judging rules |
|---|---|---|---|
| Green smart building evaluation U |
Safety and durability U1 | Safety U11 | Reasonably improve the seismic performance of buildings |
| Personnel safety protection measures | |||
| Products or accessories with safety functions | |||
| Antislip measures for indoor and outdoor floors | |||
| People and vehicles are divided and the traffic system is sufficiently illuminated | |||
| Durability U12 | Improve building adaptability | ||
| Improve the durability of building components | |||
| Improve the durability of building structure materials | |||
| Reasonable use of decoration building materials | |||
| Health and comfort U2 | Indoor air quality U21 | Control the concentration of major indoor air pollutants | |
| Decoration building materials meet national standards | |||
| Water quality U22 | Direct drinking water, landscape water, and other water quality meet national standards | ||
| Water storage facilities such as pools meet sanitary requirements | |||
| Permanent identification of water supply and drainage pipeline equipment | |||
| Acoustic environment and light environment U23 | Optimize the indoor acoustic environment of the main room | ||
| The main room divider has good sound performance | |||
| Make full use of natural light | |||
| Indoor hot and humid environment U24 | Good indoor hot and humid environment | ||
| Improve natural ventilation effect | |||
| Improve indoor thermal comfort | |||
| Convenience of life U3 | Mobility and barrier-free U31 | The site has convenient transportation | |
| Public areas meet all-age design requirements | |||
| Service facilities U32 | Provide convenient public services | ||
| Open urban green spaces, squares, and other venues | |||
| Reasonably set up fitness venues and spaces | |||
| Property management U33 | Formulate energy-saving, water-saving, and material-saving greening plans | ||
| The average daily water consumption of the building meets the national standard | |||
| Regularly evaluate the building operation effect | |||
| Establish a green education publicity and practice mechanism | |||
| Save resources U4 | Land saving and land use U41 | Economical and intensive use of land | |
| Reasonable development and utilization of underground space | |||
| Reasonable parking design | |||
| Energy-saving and energy utilization U42 | Optimizing the thermal performance of building envelope | ||
| Energy efficiency of heating and air conditioning system is better than national standard | |||
| Reduce energy consumption of heating and air conditioning systems | |||
| Adopt energy-saving equipment and energy-saving measures | |||
| Take measures to reduce building energy consumption | |||
| Reasonable use of renewable resources | |||
| Water-saving and water resources utilization U43 | Use higher-efficiency sanitary appliances | ||
| Use water-saving equipment for irrigation and cooling water | |||
| Comprehensive utilization of rainwater to make landscape water | |||
| Use nontraditional water sources | |||
| Wood-saving and green building materials U44 | Integrated design and construction of civil engineering and decoration | ||
| Reasonable selection of building structure materials and components | |||
| Industrialized interior parts are selected for building decoration | |||
| Use recyclable and reusable materials | |||
| Choose green building materials | |||
| Livable environment U5 | Site ecology and landscape U51 | Reasonable layout of buildings and landscapes | |
| Planning surface and roof stormwater runoff | |||
| Reasonably set up green land | |||
| Reasonably arrange outdoor smoking areas | |||
| Set up green rainwater infrastructure | |||
| Outdoor physical environment U52 | The environmental noise inside the venue is better than the national standard | ||
| Building and lighting design to avoid light pollution | |||
| Comfortable and natural ventilation | |||
| Reduce heat island strength | |||
| Smart U6 | Smart security U61 | Equipped with public safety smart warning function | |
| Video surveillance with detection function | |||
| Set up an emergency response system | |||
| Computer room engineering and its own protective measures specification | |||
| Effective display of video security monitoring system | |||
| Fire and security have linkage function and work normally | |||
| The security system has the ability to prevent damage | |||
| The security system uses a dedicated transmission network | |||
| Smart architecture and platform U62 | Support the deployment of IoT application services | ||
| The platform can centrally monitor and manage each subsystem | |||
| The platform follows the principle of modular construction | |||
| The platform supports secondary development | |||
| Realize equipment life cycle monitoring and management | |||
| With the docking function of smart building operation and maintenance platform | |||
| The platform can intelligently analyze data | |||
| Specific applications such as data sharing | |||
| Smart operation U63 | Has a smart parking management system | ||
| Has a smart property management system | |||
| Realize smart home with IoT technology | |||
| With personnel positioning indoor navigation service | |||
| Complete information query and release system | |||
| Wireless network coverage on demand | |||
| Access to smart platform for main electrical building equipment | |||
| With office automation system | |||
| Has a building energy metering management platform | |||
| Set up an automatic remote metering system | |||
| Set up air quality monitoring and release system | |||
| Set up an online monitoring system for water quality and water supply and drainage | |||
| Innovation and characteristics U7 | Improvement and innovation U71 | Further reduce the energy consumption of heating and air conditioning systems | |
| Architectural style design and inheritance of architectural culture | |||
| Increase the green capacity of the site | |||
| Reasonable selection of abandoned sites | |||
| Structural system and building components meet requirements | |||
| Apply BIM technology | |||
| Reduce carbon emission intensity per unit area | |||
| Green construction and management | |||
| Use of insurance products for potential defects in construction project quality | |||
| Characteristics U72 | Obtain the green building logo | ||
| Meet the requirements of the national grid | |||
| Set equipment monitoring health index | |||
| Meet the individual needs of different acquaintances | |||
| Apply big data artificial intelligence and other technologies |
Remarks: Innovation and characteristics are the corresponding improvement of U1–U6 index factors.