Skip to main content
. 2021 Nov 5;10(10):3688–3699. doi: 10.4103/jfmpc.jfmpc_282_21

Table 3.

Multivariate linear regression showing the relation between the average delivery load and components assessed for the health facility (infrastructure, equipment and consumables and healthcare provider knowledge)

B β t P 95% Confidence interval
Infrastructure -2.840 -0.223 -1.266 0.212 -7.361-1.682
Equipment and consumables 10.452 0.793 4.015 <0.001 5.206-15.698
Knowledge of healthcare providers 3.464 0.260 2.129 0.039 0.184-6.743