Skip to main content
. 2021 Nov 25;12:735127. doi: 10.3389/fpsyg.2021.735127

TABLE 2.

Construct reliability and validity of China vs. Pakistan.

Construct Total Sample
China
Pakistan
α rho_A CR AVE α rho_A CR AVE α rho_A CR AVE
ATSE 0.81 0.82 0.87 0.57 0.81 0.83 0.87 0.58 0.79 0.80 0.86 0.55
ENV 0.84 0.85 0.89 0.68 0.85 0.86 0.90 0.69 0.81 0.81 0.87 0.64
EXTR 0.81 0.84 0.86 0.56 0.81 0.84 0.86 0.56 0.81 0.85 0.87 0.58
GSE 0.80 0.81 0.87 0.63 0.77 0.79 0.85 0.59 0.82 0.83 0.88 0.66
INTR 0.86 0.86 0.90 0.64 0.86 0.86 0.90 0.63 0.86 0.86 0.90 0.65
JSEC 0.75 0.77 0.84 0.57 0.74 0.76 0.84 0.57 0.74 0.77 0.83 0.56
PED 0.65 0.68 0.79 0.50 0.65 0.70 0.79 0.50 0.61 0.62 0.77 0.46
PEF 0.74 0.75 0.83 0.49 0.69 0.73 0.80 0.45 0.77 0.78 0.85 0.53
SEI 0.89 0.90 0.92 0.70 0.89 0.90 0.92 0.69 0.89 0.89 0.92 0.69

α, Cronbach’s Alpha; (rho_A) Reliability Coefficient CR, Composite Reliability; AVE, Average variance extracted.