Table 5.
Predicted risks and mitigation strategies
| Risk | Mitigation strategy |
| Loss of power | Generator/UPS |
| CO2/special gas mix failure | Automatic gas changeover manifold; regulators |
| Liquid nitrogen storage tank emptying | Liquid nitrogen level alarms |
| Regular measuring/top-up of tanks. Replacement at end of life span. Safety training is a must | |
| Staff member injured | Low oxygen level and high CO2 alarms PPE |
| Fire alarms/extinguishers | |
| Break into laboratory | Security monitoring; security response; locks on liquid nitrogen tanks |
| Equipment failure | Alarm system; spare equipment; service/maintenance contracts; arrangements with competitors |
| IT virus/hacking – loss of data | Regular backups (stored offsite); antivirus software |
PPE=Personal protective equipment, UPS=Uninterruptible power supply