Swindon 1981.
Methods | CBA 4 yrs before data. 2 yrs after data. | |
Participants | I) 2.8 KM section of an all purpose arterial road in Swindon, UK C) Three routes of similar layout, frontage development and radial function. The local council agreed to keep road works to a minimum in this area. | |
Interventions | I) A number of traffic calming measures including roundabouts, pedestrian crossings and changes to intersections. C) No changes. | |
Outcomes | Road traffic crash related injuries. | |
Notes | Behaviour of the control routes was atypical of other types of road in Swindon during the study period. No information given on perceived safety or quality of environment. |