Skip to main content
. 2021 Dec 8;21(24):8206. doi: 10.3390/s21248206

Table 5.

Cost of computation comparison.

Schemes MSP ISVP BSVP
Bayat et al. [36] 5Tbp+TM·T·P+2Th 4Tbp+3Tbp·pm+TM·T·P+2Th nTbp+nTbp·pm+nTM·T·P+nTh
Lei Zhang et al. [37] 2TM·T·P+3Th 3Tbp+2TM·T·P+3Th 3Tbp+(2n)TM·T·P+(3n)Th
Bayat et al. [38] 1TM·T·P 3Tbp+1Tbp·pm+1TM·T·P 3Tbp+nTbp·pm+nTM·T·P
Pournaghi et al. [39] 3Tbp·pm+Tbp·pa+1TM·T·P+2Th 3Tbp+3Tbp·pm+1TM·T·P+1Th 3Tbp+(3n)Tbp·pm+nTM·T·P+nTh
Bayat et al. [41] 1Tbp+4Tbp·pm+1TM·T·P+1Tbp·pa+3Th 2Tbp+4Tbp·pm+1TM·T·P+1Tbp·pa+3Th (4+n)Tbp·pm+nTM·T·P+(n)Tbp·pa+nTh
SE-CPPA 1Th 2Tbp+2Tbp·pm+2Th Tbp+nTbp·pm+(2n)Th