Skip to main content
. 2021 Nov 16;247(1):1–75. doi: 10.1177/15353702211052280

Figure 22.

Figure 22.

Constructive interdependent qualification processes for MPS-based context-of-use assays at TissUse. Equipment qualification includes Installation qualification (IQ), Operational qualification (OQ) and performance qualification (PQ) at end-user sites after technology transfer.