Skip to main content
. 2022 Jan 3;14(1):216. doi: 10.3390/cancers14010216

Table 4.

The risk-of-locoregional-recurrence calculator, which can be used in clinical practice to calculate the risk per specific patient of locoregional recurrence during the follow-up time of 2 years. The yellow boxes can be filled in with the specific patient data in order to calculate the risk of locoregional recurrence, distant metastasis or death, in which gender is either 1 (male) or 0 (female). HPV status is either 1 (positive) or 0 (negative) and N-stage is either 0 (stage 0–1) or 1 (stage 2–3). The risk-of-metastasis calculator, which can be used in clinical practice to calculate the risk per specific patient of metastasis during the follow-up time of 2 years. The yellow boxes are filled in with the single patient data (with a large tumor) in order to calculate the risk of metastasis. The risk-of-death calculator, which can be used in clinical practice to calculate the risk per specific patient of death during the follow-up time of 2 years. The yellow boxes can be filled in with the single patient data in order to calculate the risk of death.

Locoregional Recurrence Risk Calculator Metastasis Risk Calculator Death Risk Calculator
Predictor Fill-In Formula Result Predictor Fill-In Formula Result Predictor Fill-In Formula Result
PRE-ADC_kurtosis x 0.317326 A PRE-ADC_kurtosis x 1.233603 A Gender x −0.685436 A
PRE-Kep x 0.168844 B PRE-SUV_peak x 0.167255 B HPV x −3.196345 B
PRE-SUV_peak x 1.469971 C N-stage x 0.908168 C
Δ-ADC_skewness x 0.010764 D PRE-ADC_skewness x 0.925759 D
Δ-f x −0.036035 E PRE-D x −0.138775 E
Δ-SUV_peak x −0.190617 F PRE-f x −0.277885 F
Δ-TLG x −0.008579 G PRE-MATV x 8.640004 G
PRE-SUV_mean x −0.836001 H
PRE-SUV_peak x 1.885920 I
Linear probability Y = −2.173498 + (Sum A + B + C + D + E + F + G) Linear probability Y = −5.950312 + (Sum A + B) Linear probability Y = −1.387043+ (Sum A + B + C + D + E + F + G + H + I)
Probability formula 1/(1 + exp(−Y)) = Probability formula 1/(1 + exp(−Y)) = Probability formula 1/(1 + exp(−Y)) =
Risk % Risk % Risk %