Skip to main content
. 2022 Jan 11;17(1):e0261621. doi: 10.1371/journal.pone.0261621

Table 2. Input-oriented results, variation pre-post (%) in brackets.

In bold, the catchment areas directly involved with the decisional process.

Areas Relative technical efficiency (RTE) on average (1) Probability of having an RTE score greater than 0.75(1) RTE error Stability of the ecosystem (4)
(%)
Shannon’s entropy (%) (5)
Pre (2) Post (3) Pre Post Pre Post Pre Post Pre Post
Global (Gipuzkoa MH ecosystem) (6) 0.83(7) 0.86
(3.38)
0.76 0.80
(4.85)
0.0016 0.0019
(22.26)
23.46 29.20
(24.47)
76.69 71.18
(-7.18)
Alto Deba-Arrasate 0.82 0.80
(-2.20)
0.69 0.60
(-12.18)
0.0068 0.0100
(47.02)
28.71 22.93
(-20.11)
66.07 74.20
(12.30)
Amara 0.82 0.86
(5.01)
0.63 0.77
(22.36)
0.0042 0.0050
(19.74)
29.71 36.12
(21.58)
65.91 64.01
(-2.88)
Andoain 0.95 0.96
(1.61)
0.95 0.90
(-4.67)
0.0014 0.0008
(-41.37)
51.17 56.26
(9.96)
47.55 42.46
(-10.71)
Azpeitia 0.85 0.91
(7.79)
0.83 0.91
(10.01)
0.0049 0.0019
(-60.76)
27.68 53.56
(93.50)
67.57 56.39
(-16.54)
Beasain 0.89 0.87
(-2.55)
0.90 0.84
(-6.73)
0.0021 0.0034
(62.42)
40.97 40.02
(-2.32)
58.53 67.89
(16.00)
Eguia 0.74 0.83
(12.75)
0.51 0.74
(44.78)
0.0063 0.0031
(-51.33)
27.98 28.33
(1.27)
78.42 66.24
(-15.54)
Eibar 0.77 0.78
(0.80)
0.66 0.64
(-2.69)
0.0042 0.0035
(-17.78)
19.23 30.89
(60.63)
78.26 73.29
(-6.34)
Irun 0.73 0.78
(8.01)
0.54 0.63
(16.75)
0.0078 0.0049
(-37.66)
26.22 29.38
(12.05)
79.20 71.97
(-9.12)
Ondarreta 0.81 0.83
(3.28)
0.64 0.56
(-11.55)
0.0056 0.0069
(22.68)
30.90 29.97
(-3.03)
74.22 57.82
(-22.10)
Renteria 0.82 0.85
(3.82)
0.73 0.80
(9.95)
0.0049 0.0070
(41.56)
32.24 36.93
(14.53)
72.13 63.92
(-11.38)
Tolosa 0.87 0.89
(1.58)
0.87 0.83
(-3.70)
0.0023 0.0055
(141.38)
28.27 32.11
(13.58)
72.20 70.60
(-2.21)
Zarautz 0.86 0.88
(2.19)
0.83 0.81
(-2.36)
0.0026 0.0028
(10.81)
37.05 44.25
(19.43)
68.42 64.28
(-6.05)
Zumarraga 0.86 0.90
(3.93)
0.87 0.75
(-14.42)
0.0035 0.0046
(32.49)
28.43 39.09
(37.51)
64.22 62.80
(-2.20)

(1) RTE∈[0, 1] (0: DMU completely inefficient, 1: DMU completely efficient); 500 experiments.

(2) Pre: Pre-Intervention.

(3) Post: Post-Intervention.

(4) Stability∈[0. 100] (0: minimum stability–small data changes can result in very large RTE changes; 100 maximum stability–data changes do not modify RTE).

(5) Shannon´s entropy is calculated as a percentage of the feasible maximum estimated by the frequency analysis. Entropy∈[0, 100] (0: minimum–the ecosystem has a very homogeneous management, 100: maximum–the ecosystem has a very heterogeneous management).

(6) Fifteen scenarios (meaningful variable combinations (500 experiments each); 13 catchment areas.

(7) The results have been rounded to the most appropriate number of decimal places.