Skip to main content
. 2022 Jan 10;2022:9932603. doi: 10.1155/2022/9932603

Table 7.

Mining parameters.

Mining parameters Explosive unit consumption/(kg/m3) Row spacing (m) Hole bottom distance (m) Ore drawing step pitch/row
Parameter value 0.83∼0.873 5∼1.9 1.8∼24 2∼5