Skip to main content
. 2022 Jan 17;12:798. doi: 10.1038/s41598-021-04734-2

Table 5.

Minimum or maximum values (shown in bold font) on the Pareto front for each objective in the water allocation model.

f1 (Gini coefficient) f2 (billion Yuan)
Scheme A (min. value of f1) 0.305 3363.326
Scheme B (max. value of f2) 0.314 3375.567