Skip to main content
. 2022 Jan 16;15(2):663. doi: 10.3390/ma15020663

Figure 2.

Figure 2

Two possibilities of placing the corrugated board in the 4-point bending test: (a) B-flute upwards (BE); (b) E-flute upwards (EB).