Table 2.
All | Site #1 | Site #2 | |
---|---|---|---|
Days completed (n, range) | 11.9 (5–14) | 11.4 (5–14) | 12.7 (8–14) |
Percent completion (%, range) | 85.2 (35.7–100) | 81.3 (35.7–100) | 90.55 (51.1–100) |
Completed all days | 46.4 | 31.3 | 66.6 |
Completed 70% | 82.1 | 75.0 | 91.7 |