Table 2.

Statistical table for the layout of dewatering wells in foundation pit.

Position Well type Soil layers Depth Quantity Aperture/well diameter/well pipe thickness Well No Thickness of clay ball (m)
In pit Dewatering well ① ~ ⑤3 38 12 650/273/4 mm 4 J-1 to 4 J-12 0
Depressurization well ⑦ ~ ⑧21 68 1 650/273/6 mm 4Y7-1 8
Depressurization well 63 1 650/273/6 mm 4Y7-2 8
Observation well 60 1 650/273/6 mm 4G7-1 8
Observation well 70 1 650/273/6 mm 4G8-1 8
Depressurization well 22 ~ ⑨ 85 3 850/400/8 mm 4Y9-1 to 4Y9-3 10
Spare well 85 1 850/400/8 mm 4YB9-1
Observation well 85 1 850/400/8 mm 4G9-1
Between two walls Spare and observation well 2 30 4 650/273/4 mm 4JG52-1 to 4JG52-4 0
Spare and observation well 63 4 650/273/6 mm 4JG7-1 to 4JG7-4 8
Out pit Observation well 60 4 650/273/6 mm 4WG7-1 to 4WG7-4 8
Observation well 21 70 2 650/273/6 mm 4WG8-1 to 4WG8-2 8
Observation well 22 ~ ⑨ 90 1 850/325/6 mm 4WG9-1 8