Table 4.
Application | Initial Condition | ST Method | Terminal Schedule | Additional Components | ST Method | Terminal Schedule |
---|---|---|---|---|---|---|
3 | NCR | Demand Fading | 20 demands | - | - | - |
4 | NCR | Demand Fading | 20 demands | Alt SR | Concurrent | 20 demands FR2 DRA |
8 | NCR | Increasing FT | 7 minutes | - | - | - |
13 | NCR + PUN | Increasing FT | 5 minutes | - | - | - |
20 | NCR | Increasing FT | 3 minutes | Alt SR | Increasing FT | 10 minutes |
25 | NCR + Alt SR | Increasing FT | 1.5 minutes | - | - | - |
26 | NCR | Increasing FT | 2 minutes | - | - | - |
Note. Initial Condition indicates the treatment in place when schedule thinning (ST) was first attempted; Demand Fading = increasing the number of prompts given prior to reinforcement; Increasing FT = increasing the amount of time between reinforcer deliveries; Concurrent = introducing a multiple schedule.