Skip to main content
. Author manuscript; available in PMC: 2022 Jan 27.
Published in final edited form as: J Appl Behav Anal. 2017 Feb 8;50(2):357–376. doi: 10.1002/jaba.376

Table 4.

Summary of Procedures for Applications in Which Schedule Thinning Was Implemented

Application Initial Condition ST Method Terminal Schedule Additional Components ST Method Terminal Schedule
3 NCR Demand Fading 20 demands - - -
4 NCR Demand Fading 20 demands Alt SR Concurrent 20 demands
FR2 DRA
8 NCR Increasing FT 7 minutes - - -
13 NCR + PUN Increasing FT 5 minutes - - -
20 NCR Increasing FT 3 minutes Alt SR Increasing FT 10 minutes
25 NCR + Alt SR Increasing FT 1.5 minutes - - -
26 NCR Increasing FT 2 minutes - - -

Note. Initial Condition indicates the treatment in place when schedule thinning (ST) was first attempted; Demand Fading = increasing the number of prompts given prior to reinforcement; Increasing FT = increasing the amount of time between reinforcer deliveries; Concurrent = introducing a multiple schedule.