Table 2.

The algorithm statistics index data of mine water dispatching model.

Scheduling Condition Dispatching Recycling Cost (Ten Thousand CNY) Total Cost Reduction Rate (%) Running Time (h) Efficiency Improvement (%)
The First Quarter The Second Quarter The Third Quarter The Fourth Quarter
Schedule to the nearest 6.72 7.04 7.76 8.51 30.04 - 35,040.00 -
TSA-GAPSO 6.03 6.70 6.72 7.86 27.31 9.09 32,879.85 5.81
GAPSO 6.20 6.97 6.93 7.57 27.67 7.89 33,599.04 3.95
GA 6.51 6.85 7.00 7.83 28.20 6.13 339,59.91 2.99
PSO 6.65 6.80 6.57 8.02 28.04 6.67 33,637.83 3.85