Skip to main content
. 2022 Feb 15;159:102598. doi: 10.1016/j.tre.2021.102598

Table I.1.

Performance comparison table of the Holistic Alg. III and Math-heuristic Alg. II (The presented computational time of Total alg. II and Total alg. III include the demand assignment computation and the capacity allocation computation.)

graphic file with name fx1_lrg.gif