Skip to main content
. 2022 Feb 22;17:40. doi: 10.1186/s13014-022-02007-4

Fig. 3.

Fig. 3

V95 and V90 of PTV-post in the fixed boost plan and adaptive boost plan. A V95 in all patients B V90 in all patients C V95 according to resection rate D V90 according to resection rate. GTR, gross total resection; PTV, planning target volume