Table 5.
Results of split-plot analysis of variance for the additional outcome.
|
Intervention (n=63) | Control (n=63) | Test statistica,b | P value | ||
|
Baseline | Follow-up | Baseline | Follow-up |
|
|
Number of late days in past month | 0.7 (1.8) | 0.4 (1.1) | 0.8 (1.9) | 0.7 (1.7) | 0.48 | .49 |
Number of early leave days in past month | 0.3 (0.6) | 0.1 (0.4) | 0.3 (0.9) | 0.3 (0.9) | 0.74 | .39 |
Number of absent days in past month | 0.1 (0.2) | <0.1 (0.2) | <0.1 (0.1) | <0.1 (0.3) | 0.49 | .48 |
aStatistics (F test) reported are for the interaction between intervention and time of each variable.
bdegree of freedom: 1124.