Skip to main content
. 2022 Feb 27;14(2):442–455. doi: 10.4254/wjh.v14.i2.442

Figure 4.

Figure 4

Overlapping definitions of timing of bile duct injury repair. A: Dotted lines indicate different cut offs according to heterogeneous definitions of timing; B: Subgroup analysis after exclusion of overlapping definitions. Dotted lines indicates cut off for BDI repair at 14 d after LC. 1: 24 h and 72 h. 61: 45 d.