Potential water containers and type for Vector blocks in Curepe, Trinidad, 2019.

Block number Total units Inspection date No. units inspected Tanks Drums Tubs and basins Tires Small Misc Indoors Totala
8 39 June 27–28 None
July 23 12 8 1/4 64 1 86 2 1/164
September 3–4 18 7 7 165 0 147 17 0/343
October 15 20 21 10 2/58 1/19 230 39 3/377
November 20 21 5 2 2/79 2/21 122 15 4/244
9/11 79 June 27–28 38 43 4 99 5 139 9 0/299
July 23 36 40 3 155 0 145 10 0/354
September 3–4 40 42 9 1/173 0 170 19 1/411
October 15 30 37 2 148 4 140 25 0/356
November 20 42 49 2 180 12 241 43 0/518
10 82 June 27–28 26 35 9 184 6 273 4 0/424
July 23 52 31 24 1/288 9 1/514 32 2/898
September 3 34 35 10 2/119 5 1/295 32 3/496
October 15 49 50 24 1/131 10 1/486 15 2/714
November 20 54 28 2 2/83 2 170 15 2/284