Skip to main content
. 2022 Feb 28;25(4):103990. doi: 10.1016/j.isci.2022.103990

Figure 3.

Figure 3

DAC and CCS plants around the globe

Green, Red, and Orange circles denote the operational status of the plants - Operating, Under Construction, or Planning, Nonoperating, respectively.