Table 6.
Path | Original Sample | Standard Error | t-Value | p-Value |
---|---|---|---|---|
KN → ATT → SUPT | 0.099 | 0.029 | 3.417 | 0.001 |
SMU → ATT → SUPT | 0.047 | 0.021 | 2.299 | 0.022 |
KN → ATTT → SUPT | 0.064 | 0.018 | 3.575 | 0.000 |
SMU → ATTT → SUPT | 0.033 | 0.015 | 2.153 | 0.031 |
KN → RP → SUPT | −0.054 | 0.020 | 2.716 | 0.007 |
SMU → RP → SUPT | −0.005 | 0.011 | 0.451 | 0.652 |