Skip to main content
. 2022 Feb 11;22(4):1387. doi: 10.3390/s22041387

Table 2.

Summary of key notations.

Notation Definition
R Set of RSU, R=r1,r2,r3,,rn
B Set of Macro Base Station, B=b1,b2,b3,,bn
V Set of vehicles, V=v1,v2,,vn
C Set of contents, C=c1,c2,,cn
f Chunks size
B Bandwidth
r Coverage radius of RSU
s Speed of vehicle
dvv Distance between vehicles
dvr Distance between vehicle and infrastructure
γ Zipf Exponent
t Tolerance time