Table 4.
Carbon emissions produced during on-site construction.
| Working activities | Item | Construction machine | Energy | Energy consumption | Carbon emissions (t) |
|---|---|---|---|---|---|
| Foundation | Earth excavation | Crawler type mechanical single bucket excavator within 1.0 m³ | Diesel | 1,209.33 kg | 4.44 |
| Stone excavation | Crawler type mechanical single bucket excavator within 1.0 m³ | Diesel | 766.86 kg | 2.81 | |
| Motorized air compressor within 9 m3/min | Electricity | 1,433.42 kWh | 1.66 | ||
| Impact drilling pile | Crawler type mechanical single bucket excavator within 1.0 m³ | Diesel | 114.23 kg | 0.42 | |
| Trucks within 10 t | Diesel | 310.87 kg | 1.14 | ||
| Truck crane within 16 t | Diesel | 278.41 kg | 1.02 | ||
| JK8 percussion drill | Electricity | 10,157.69 kWh | 13.10 | ||
| Mud separator | Electricity | 74.55 kWh | 0.10 | ||
| Mud mixer | Electricity | 434.89 kWh | 0.56 | ||
| Mud pump within Φ 100 mm | Electricity | 1,275.30 kWh | 1.65 | ||
| AC arc welder within 42 kV A | Electricity | 331.52 kWh | 0.43 | ||
| Manual digging pile | Single barrel slow winch within 50 kN | Electricity | 15,087.19 kWh | 19.46 | |
|
| |||||
| Bridge substructure | Concrete | Concrete delivery pump within 60 m3/h | Electricity | 18,372.52 kWh | 23.70 |
| Truck crane within 25 t | Diesel | 2,868.75 kg | 10.53 | ||
| Steel | Truck crane within 25 t | Diesel | 2,562.28 kg | 9.40 | |
| Automatic steel seam welder | Electricity | 4,148.22 kWh | 5.35 | ||
| AC arc welder within 32 kV A | Electricity | 9,809.58 kWh | 12.65 | ||
| Bearing | Truck crane within 20 t | Diesel | 206.96 kg | 0.21 | |
| AC arc welder within 32 kV A | Electricity | 178.36 kWh | 0.23 | ||
|
| |||||
| Bridge superstructure | Concrete | Concrete delivery pump within 60 m3/h | Electricity | 43,544.45 kWh | 56.17 |
| Truck crane within 25 t | Diesel | 40,285.13 kg | 147.85 | ||
| Cast-in-place T-beam reinforcement | AC arc welder within 32 kV A | Electricity | 44,693.70 kWh | 57.66 | |
| AC butt welder within 150 kV A | Electricity | 20,485.11 kWh | 26.43 | ||
| Centralized and standardized processing of rebar | CNC vertical rebar bending center | Electricity | 711.17 kWh | 0.92 | |
| AC arc welder within 32 kV A | Electricity | 44,693.70 kWh | 57.66 | ||
| AC butt welder within 150 kV A | Electricity | 20,485.11 kWh | 26.43 | ||
| Prestressed concrete | Concrete delivery pump within 60 m3/h | Electricity | 98,556.12 kWh | 127.14 | |
| Single-cylinder slow-motion winch within 30 kN | Electricity | 2,681,021.27 kWh | 3,458.52 | ||
| Single-cylinder slow-motion winch within 50 kN | Electricity | 934,667.96 kWh | 1,205.72 | ||
| Φ100 mm electric multistage water pump (≤120 m) | Electricity | 204,479.87 kWh | 263.78 | ||
| AC arc welder within 32 kV A | Electricity | 51,668.13 kWh | 66.65 | ||
| Steel strand | Prestressed steel tensile machine | Electricity | 2,284.49 kWh | 2.95 | |
| Bellows rolling machine | Electricity | 571.23 kWh | 0.74 | ||
| Prestressed reinforcement | Prestressed stretching machine within 900 kN | Electricity | 6980.95 kWh | 9.01 | |
| Bellows rolling machine | Electricity | 621.10 kWh | 0.80 | ||
| Single-cylinder slow-motion winch within 50 kN | Electricity | 6,607.41 kWh | 6.61 | ||
|
| |||||
| Other installation | Optical cable laying | Trucks within 10 t | Diesel | 134.38 kg | 0.49 |
| Engine-driven air compressor within 17 m3/min | Electricity | 46.36 kWh | 0.06 | ||
| Electric cable laying | Trucks within 10 t | Diesel | 33.58 kg | 0.12 | |
| Truck crane within 5 t | Diesel | 9.95 kg | 0.04 | ||