Table 2:
Water Quality Impacts of SGD Chemicals
| A. Water Quality Impacts of Drilled Well Bores | ||||
|---|---|---|---|---|
| Sample | SGD Chemicals | Non-SGD | ||
| Dep. Var. | Log Result | Detection | Std. Result | Log Result |
| Bores, <0.5km | 0.0133** (0.00675) |
0.0587*** (0.0166) |
0.0840 (0.0716) |
0.00245 (0.00417) |
| Bores, 0.5–1km | 0.00907** (0.00413) |
0.0263*** (0.00965) |
0.0912** (0.0365) |
−0.00280 (0.00230) |
| Bores, 1–2km | −0.000347 (0.000772) |
2.26e-05 (0.00209) |
0.0273** (0.0118) |
0.000364 (0.000468) |
| Bores, 2–3km | −0.000300 (0.000618) |
0.00146 (0.00197) |
−0.0135* (0.00740) |
−0.000255 (0.000449) |
| Bores, 3–4km | 0.000148 (0.000528) |
0.000737 (0.00164) |
0.0103* (0.00618) |
0.000324 (0.000337) |
| Bores, 4–5km | −0.000247 (0.000427) |
−0.00250* (0.00149) |
0.00408 (0.00585) |
−0.000857 (0.000537) |
| B. Heterogeneity & Placebo Tests (SGD Chemicals) | ||||
| Dep. Var.: Log Result Threat Type: | Uphill (A) vs. Downhill | Produced (A) vs. Never Produced | Future Drilling | Permitted Wells |
| Type A Bores, <1km | 0.0101** (0.00448) |
0.0131* (0.00730) |
||
| Type B Bores, <1km | 0.00497 (0.00321) |
0.00555 (0.00402) |
||
| Bores, Next 180 days, <1km | 0.00587 (0.00393) |
|||
| Permitted Bores, <1km | 0.00642 (0.00499) |
|||
| Obs. | 69,237 | 69,237 | 69,237 | 69,237 |
Note. Table presents water quality impacts of SGD. Each column is a separate regression. The estimation sample consists of either SGD or non-SGD related water measurements from ground water-based community water systems with any water source within 10 km of any gas well. In panel A, the main regressors of interest are drilled well bores (at various distances to the water source). Across columns, we vary the sample (SGD or non-SGD related) and the dependent variable. Panel B re-estimates the specification in column 1 of panel A, except (1) it does not separate out well bores drilled within 0.5 and 1 kilometer, and (2) either distinguishes well bores within 1 kilometer as being Type A (uphill or producing) or Type B (downhill or never producing), or (3) adds additional variables for which we would expect no impact (future drilling or permitted well bores). Impacts at 1 kilometer for “Future Drilling” and “Permitted Wells” in panel B are not shown. Robust standard errors in parentheses are clustered at the CWS level.
p<0.01,
p<0.05,
p<0.1.