Table 3.
qPCR cycling conditions
Steps | Temperature | Time | Cycles |
---|---|---|---|
Start-up | 4°C | 2 min | |
Initial Denaturation | 95°C | 15 min | 1 |
Denaturation | 95°C | 15 s | 40 cycles |
Annealing | 60°C | 1 min | |
Extension | 95°C | 30 s | |
Melt Curve | 65°C–95°C | 0.5 °C/5 s | |
Hold | 25°C | 5 min |