Skip to main content
. 2021 Apr 18;37(2):206–211. doi: 10.1007/s12291-021-00975-0

Table 3.

The operational parameter settings of ICP-MS for lead (Pb) analysis

Element Radio frequency power supply Cool gas flow rate Intermediate gas flow rate Nebulizer gas flow rate Dwell time
Lead (Pb) 1404 W 13 L/min 0.7 L/min 0.98 L/min 10 ms/peak