TABLE 9.
Measurement model (with moderation).
| Variables | Factor loadings |
VIF | Composite reliability | AVE | |
| Personal competition | PC1 | 0.884 | 2.984 | ||
| PC2 | 0.833 | 2.278 | 0.919 | 0.739 | |
| PC3 | 0.820 | 1.705 | |||
| PC4 | 0.900 | 3.544 | |||
| Playing dumb | PD1 | 0.869 | 2.365 | ||
| PD2 | 0.922 | 4.342 | 0.942 | 0.802 | |
| PD3 | 0.869 | 2.521 | |||
| PD4 | 0.919 | 4.201 | |||
| Team performance | TP1 | 0.759 | 1.991 | ||
| TP2 | 0.800 | 2.798 | |||
| TP3 | 0.780 | 2.387 | 0.906 | 0.581 | |
| TP4 | 0.788 | 1.779 | |||
| TP5 | 0.759 | 2.600 | |||
| TP6 | 0.735 | 2.357 | |||
| TP7 | 0.711 | 2.291 | |||
| Task interdependence | TI1 | 0.859 | 2.248 | ||
| TI2 | 0.879 | 3.099 | |||
| TI3 | 0.887 | 2.754 | 0.922 | 0.747 | |
| TI4 | 0.831 | 2.688 | |||