Skip to main content
. 2022 Apr 22;20(6):2825–3069. doi: 10.1007/s10518-022-01357-4

Fig. 114.

Fig. 114

Cross-section of the Sharredushk dam showing original (beige) and raised (yellow) sections and also indicating existing sink holes in the upstream face (Courtesy of Mr Tim Hill)