Skip to main content
. 2021 Sep 15;198(5):436–447. doi: 10.1007/s00066-021-01846-6

Fig. 1.

Fig. 1

Diagram of the data recorded for W‑ET and W‑noET in order to calculate r′ and the maximum E‑curve deviation for each workflow