Skip to main content
. 2022 Apr 12;6(4):e35418. doi: 10.2196/35418

Figure 3.

Figure 3

Process flow for linking experience requirements with technology capabilities to enable the delivery of required SRRs. IMA: Infrastructure Maturity Assessment; SOC: sense of coherence; SRR: specific resistance resource.