Table 2.
Problem | Binary var | Positive var | Free var | Constraint | Cost (TDollar) | Energy (MW) | Time (second) | |
---|---|---|---|---|---|---|---|---|
P1-main | 3.3.3.3.3.3.3.3.3.3.3 | 18 | 2031 | 31 | 1263 | 61,369.620 | 37.1553 | 1.758 |
Problem | Binary var | Positive var | Free var | Constraint | Cost (TDollar) | Energy (MW) | Time (second) | |
---|---|---|---|---|---|---|---|---|
P1-main | 3.3.3.3.3.3.3.3.3.3.3 | 18 | 2031 | 31 | 1263 | 61,369.620 | 37.1553 | 1.758 |