Skip to main content
. 2022 Feb 11;23(5):e13560. doi: 10.1002/acm2.13560

TABLE 2.

Results of the predicted gating windows estimated from the optimizer algorithm

Field number Actual gating window Predicted gating window Difference in gating
Plan 1, T = 2.0 cm 1 30%–70% 40%–80% 10%
2 30%–70% 25%–65% 5%
3 30%–70% 25%–65% 5%
Plan 2, T = 2.0 cm 1 30%–70% 20%–60% 10%
2 30%–70% 40%–80% 10%
3 30%–70% 25%–65% 5%
Plan 1, T = 4.0 cm 1 30%–70% 45%–55% 0%
2 30%–70% 45%–55% 0%
3 30%–70% 50%–70% 10%
Plan 2, T = 4.0 cm 1 30%–70% 25%–55% 10%
2 30%–70% 35%–55% 5%
3 30%–70% 45%–55% 0%