Production efficiency at the end of the separation, the product (P) and waste (W) activities

Beam current [μA] No Activity P [MBq] Activity W [MBq] Activity P+W [MBq] %P %W
10 1 16.28 4.44 20.72 78.44 21.56
2 10.36 3.70 14.06 74.12 25.88
3 13.69 1.11 14.80 93.37 6.63
4 17.76 0.74 18.50 95.93 4.07
5 11.84 4.07 15.91 74.33 25.67
6 17.39 3.33 20.72 83.25 16.75
7 24.42 0.74 25.16 97.19 2.81
8 22.20 1.11 23.31 94.79 5.21
9 12.95 1.48 14.43 90.83 9.17
15 10* 52.17 4.07 56.61 92.59 7.41

The irradiation parameters: beam current 10 μA (No: 1–9) and 15 μA (No: 10 denoted with *), irradiation time of 1.5 h, Havar foil thickness of 0.2 mm