Table 3.
The statistics of the dual-task cost during Task 2 and Task 3.
| Task 2 | Task 3 | |||||
|---|---|---|---|---|---|---|
| CG | EG | Significance | CG | EG | Significance | |
| Mean ± SD | Mean ± SD | p | Mean ± SD | Mean ± SD | p | |
| Step length | −0.12 ± 7.07 | 1.22 ± 7.25 | 0.532 | −0.12 ± 7.07 | 1.22 ± 7.25 | 0.532 |
| Step speed | −1.20 ± 7.17 | −5.32 ± 8.25 | 0.071 | −1.20 ± 7.17 | −5.32 ± 8.25 | 0.071 |
| Step frequency** | −0.82 ± 6.59 | −6.41 ± 6.89 | 0.007 | −0.82 ± 6.59 | −6.41 ± 6.89 | 0.007 |
| Step time** | 1.26 ± 6.77 | 7.45 ± 8.67 | 0.007 | 1.26 ± 6.77 | 7.45 ± 8.67 | 0.007 |
| Support time** | 1.26 ± 7.82 | 8.66 ± 9.98 | 0.005 | 1.26 ± 7.82 | 8.66 ± 9.98 | 0.005 |
| Support phase* | 0.04 ± 1.53 | 1.08 ± 1.64 | 0.030 | 0.04 ± 1.53 | 1.08 ± 1.64 | 0.030 |
*p < 0.05; **p < 0.01.