Skip to main content
. 2022 Jun 7;288:106843. doi: 10.1016/j.bpc.2022.106843

Fig. 5.

Fig. 5

Histograms of the end-to-end distance of IDR1,2,3 (A,B,C). The lines in gray and black correspond to the ensemble of simulation structures before and after refinement, respectively.